

Bottling
Engineered and manufactured a new replacement for filling line main drive gear, crisis delivery required.


Plastic Extrusion
Reverse engineered, rebuilt, and repaired gear set in less than 2 weeks.

Pulp & Paper
Redesigned new gear set with change in material and diametral pitch, extending service life.

Steel
Breakdown analysis, reverse engineering, and in-house machining required for gearbox repair.